Refurbishment & Retrofit

ECT Portfolio: Refurbishment & Retrofit

BUKIT BINTANG PLAZA SHOPPING CENTRE, KUALA LUMPUR

Contract Sum: RM850,000.00
Year of Project Completion: 2003

This project involved the replacement of 2 units of existing water-cooled chillers with another 2 new Carrier 400RT water-cooled centrifugal chillers (inclusive of modification and installation of new pipeworks and accessories within the chiller plantroom) at this prestigious shoppersÂ’ paradise, right in the heart of the Golden Triangle. The work involved was challenging due to the short duration of the contract and more importantly, the operation of the air-conditioning system for the shopping centre was to remain uninterrupted. With meticulous planning and execution of the work, the replacement work of the chillers went smoothly and the operation of the air-conditioning system was never compromised.

SENAI AIRPORT, JOHOR BAHRU

Contract Sum: RM700,000.00
Year of Project Completion: 2005

The arrival and departure Halls at Senai Airport underwent major refurbishment and renovation in 2005. Our ACMV works involved in this project were modification of chilled water pipes, removal and installation of new chilled water fan coil units and air handling units. In addition, Fire Protection system, which consisted of sprinkler systems, fire alarm and hose reel systems, were also installed.

UDA OCEAN SHOPPING CENTRE, KUALA LUMPUR

Contract Sum: RM480,000.00
Year of Project Completion: 2006

Located at the heart of Chinatown, Kuala Lumpur, this shopping centre has withstood the test of time and has outlived the lifespan of the existing chiller and air handling units. The works involved the replacement of one unit of water-cooled centrifugal chiller and 3 units of chilled water coils for the existing air handling units. Similarly, the challenge here was to get the equipment and relevant accessories replaced, tested and commissioned, without interrupting the operation of the business premise.